{"id":39938,"date":"2026-04-08T07:37:51","date_gmt":"2026-04-08T07:37:51","guid":{"rendered":"https:\/\/elite-bricks.com\/?p=39938"},"modified":"2026-04-08T07:37:52","modified_gmt":"2026-04-08T07:37:52","slug":"dubais-al-mamzar-corniche-project-88-complete-to-be-new-generation-coastal-spot","status":"publish","type":"post","link":"https:\/\/elite-bricks.com\/fr\/2026\/04\/08\/dubais-al-mamzar-corniche-project-88-complete-to-be-new-generation-coastal-spot\/","title":{"rendered":"Dubai&#8217;s Al Mamzar Corniche project 88% complete, to be &#8216;new generation&#8217; coastal spot"},"content":{"rendered":"<p>Al Mamzar Corniche project is now 88% complete. Photo: KT File Photo<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The project is on track to redefine Dubai\u2019s beachfront with women-only night beach, climate-resilient infrastructure, and 400 per cent expansion of public shoreline<\/h2>\n\n\n\n<p>The\u00a0Al Mamzar Corniche development\u00a0project is now 88 per cent complete and progressing in line with its delivery timelines. The milestone was confirmed during a field visit by Marwan Ahmed bin Ghalita, Director General of Dubai Municipality, who inspected construction progress, supply chains, and operational readiness of the project.<\/p>\n\n\n\n<p>He said that the project represents a \u201csignificant step\u201d in redefining\u00a0public beach development. \u201cIt introduces a new generation of integrated coastal destinations that combine architectural excellence, environmental preservation, and climate adaptability, while delivering sustainable social and economic value,\u201d he said.<\/p>\n\n\n\n<p>\u201cThis reinforces Dubai\u2019s leadership as a global tourism destination offering exceptional beach and leisure experiences for residents and visitors alike.\u201d<\/p>\n\n\n\n<p><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/imgengine.khaleejtimes.com\/khaleejtimes-english\/2026-04-07\/bibwri2l\/Marwan-Bin-Ghalita-inspects-AL-Mamzar-beach-project.png?width=800&amp;height=600&amp;q=60&amp;format=auto\" alt=\"Marwan Bin Ghalita inspects Al Mamzar Corniche development project\" height=\"1350\" width=\"1080\"><\/p>\n\n\n\n<p>Marwan Bin Ghalita inspects Al Mamzar Corniche development project<\/p>\n\n\n\n<p>Last year, the Dubai Municipality had\u00a0awarded the contract\u00a0for the second phase of the project. Both phases of the 125,000 square metres project will be completed at an estimated cost of around Dh400 million.\u00a0\u00a0<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Women-only beaches<\/h3>\n\n\n\n<p>One of the highlights of the project will be a public beach dedicated exclusively to women, available for night swimming and designed to the highest international standards for privacy and safety. The beach will be fully enclosed by a surrounding fence to guarantee complete privacy.<\/p>\n\n\n\n<p>\u201cThe scale of these projects reflects our commitment to delivering integrated coastal destinations that prioritise resilience, safety, and visitor experience,\u201d&nbsp;said Badr Anwahi, CEO of the Public Facilities Agency at Dubai Municipality.&nbsp;\u201cThese developments are designed not only to meet current needs, but to serve future generations, strengthening Dubai\u2019s position as a global destination for high-quality beach tourism.\u201d<\/p>\n\n\n\n<p>The corniche will also feature:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Interconnected tracks for walking, jogging, and cycling<\/li>\n\n\n\n<li>Children\u2019s play areas, fitness zones, and beach activity spaces<\/li>\n\n\n\n<li>Shaded seating areas for continuous day-to-night use<\/li>\n\n\n\n<li>Dedicated spaces for events and seasonal activities<\/li>\n\n\n\n<li>A shaded skate park<\/li>\n<\/ul>\n\n\n\n<p>Health and service facilities, along with food and beverage outlets, will be distributed along the beachfront according to global best practices to ensure comfort and privacy.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Climate resilience<\/h3>\n\n\n\n<p>As part of Dubai Municipality\u2019s commitment to climate adaptation and infrastructure resilience, the project includes measures to elevate beach levels and strengthen coastal protection against the impacts of climate change.<\/p>\n\n\n\n<p>More than 500,000 cubic metres of beach sand have been utilised based on specialised environmental studies to enhance shoreline stability and ensure long-term sustainability.<\/p>\n\n\n\n<p>The project supports the objectives of the Dubai 2040 Urban Master Plan and the Public Beaches Master Plan, which aim to increase the total length of public beaches by 400 per cent and ensure accessible, high-quality coastal destinations for all.<\/p>\n\n\n\n<p>The visit forms part of the municipality\u2019s broader efforts to advance the development of public beaches and strengthen Dubai\u2019s position as a leading global destination for beach tourism.&nbsp;<\/p>\n\n\n\n<p><strong>Source: Khaleej Times<\/strong><\/p>\n\n\n\n<p><strong>Published: 7 <strong>April <\/strong>2026<\/strong><\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Al Mamzar Corniche project is now 88% complete. Photo: KT File Photo The project is on track to redefine Dubai\u2019s beachfront with women-only night beach, climate-resilient infrastructure, and 400 per cent expansion of public shoreline The\u00a0Al Mamzar Corniche development\u00a0project is now 88 per cent complete and progressing in line with its delivery timelines. The milestone [&hellip;]<\/p>","protected":false},"author":7,"featured_media":39949,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[6442,6443,6439,6440,6441],"class_list":["post-39938","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-al-mamzar-corniche","tag-dubai-al-mamzar","tag-dubai-coastal-destinations","tag-dubai-development-projects","tag-dubai-waterfront-project"],"_links":{"self":[{"href":"https:\/\/elite-bricks.com\/fr\/wp-json\/wp\/v2\/posts\/39938","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elite-bricks.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/elite-bricks.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/elite-bricks.com\/fr\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/elite-bricks.com\/fr\/wp-json\/wp\/v2\/comments?post=39938"}],"version-history":[{"count":1,"href":"https:\/\/elite-bricks.com\/fr\/wp-json\/wp\/v2\/posts\/39938\/revisions"}],"predecessor-version":[{"id":39950,"href":"https:\/\/elite-bricks.com\/fr\/wp-json\/wp\/v2\/posts\/39938\/revisions\/39950"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/elite-bricks.com\/fr\/wp-json\/wp\/v2\/media\/39949"}],"wp:attachment":[{"href":"https:\/\/elite-bricks.com\/fr\/wp-json\/wp\/v2\/media?parent=39938"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/elite-bricks.com\/fr\/wp-json\/wp\/v2\/categories?post=39938"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elite-bricks.com\/fr\/wp-json\/wp\/v2\/tags?post=39938"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}